Anthropic is hiring an Environmental Health & Safety Manager for Data Center Construction and Operations, responsible for owning EHS programs across the full lifecycle of data center sites—from construction and commissioning to live operations. The role focuses on contractor safety, high‑hazard exposure management, incident investigation, and building a safety culture across geographically distributed sites.
Environmental Health & Safety Manager, Data Center Construction and Operations en Anthropic
Remoto - Remote, United States
Más vacantes en AnthropicRequirements
Skills
- 8+ years of EHS experience, with significant time spent on construction, mission‑critical, data center, or heavy industrial/operational projects
- Deep hands‑on expertise in contractor and construction safety, including prequalification, safety plan review, high‑hazard work permitting, and multi‑employer worksite oversight
- Strong working knowledge of OSHA construction standards (29 CFR 1926) and general industry standards (29 CFR 1910), plus electrical safety and NFPA 70E, lockout/tagout, and fall protection
- Comfortable being the safety authority on an active worksite—making clear calls, holding contractors accountable, and stopping work when it isn’t safe
- Can build a program from the ground up and run it autonomously across multiple sites, prioritizing well when everything looks urgent
- Able to motivate and persuade contractors, operators, and cross‑functional partners to engage with safety, not just meet the minimum
- Comfortable spending significant time in the field and traveling to sites, adapting quickly as projects move through construction, commissioning, and operations
- Write clear, useful safety plans, playbooks, and program documents, and can create engaging training and presentations
- Hands‑on experience with software tools for contractor management, incident reporting, risk assessment, and related functions
- Bachelor's degree in occupational health and safety, construction management, engineering, or a related field
- Certifications such as CHST, CSP, ASP/GSP, or comparable US‑recognized construction/safety credentials
- Direct experience with data center, mission‑critical, or large capital construction projects
- Experience managing safety through commissioning and the handover into operations
- Deep electrical safety expertise (NFPA 70E, arc flash, energized work)
- Experience building a contractor safety program from scratch across distributed sites
- Familiarity with ISO 45001 (Occupational Health and Safety Management Systems) and ISO 14001 (Environmental Management Systems)
- Excellent computer skills—quick to pick up new applications and systems at the user and/or administrator level
Responsibilities
- Build and run contractor safety programs: prequalification and selection, safety plan and method‑statement review, site‑specific orientation, high‑hazard work permitting, and audits/inspections
- Own EHS across construction, commissioning, and operations phases
- Manage safety of energization and testing, and transition to operational safety under general industry standards (29 CFR 1910), including electrical safety and NFPA 70E, lockout/tagout, and arc flash
- Investigate incidents, near misses, and injuries across sites; drive root‑cause analysis and follow‑through on corrective actions
- Own EHS record‑keeping and reporting across the portfolio, including OSHA requirements and contractor‑injury tracking
- Represent safety in meetings with construction and operations partners: reviewing readiness, walking sites, escalating when work isn’t safe, and stopping it when necessary
- Drive a consistent safety culture across geographically distributed sites and partner organizations
- Build emergency preparedness, run or oversee drills, and ensure lessons from one site reach the others
- Select and manage external support partners (third‑party safety, industrial hygiene, audit partners) and contribute to site design and safety standards for new builds
Descubre si tu currículum está listo para esta vacante
Mira cómo nuestra IA puede optimizar tu currículum y aumentar tus chances en este puesto.